Factory Construction in Bien Hoa

A factory in Bien Hoa is the place directly manufacturing business products and the workplace for many employees. It can be seen how important a factory is to an enterprise, therefore, the factory construction is carried out extremely strictly at each step. To complete the factory in accordance with the requirements and desires of the investor, a detailed and specific plan is needed. Especially in the design phase, it needs to show clearly from detailed raw materials and technical data parameters to detailed structures for the factory.

1. Steps of factory construction:

1.1 Foundation construction:

+ Site leveling: The contractor must examine the foundation status to proceed with leveling appropriate to the drawing. + Center axis positioning: This is an important step helping determine the position of column foundations on the drawing. + Fence foundation excavation: The fence surrounds the factory so it will be long, tall, and must be solid. + Foundation construction: After having the center axis, construction of the foundation will begin, using reinforced concrete materials. + Compacting soil and stones for the factory: After leveling, the soil ground will be compacted to the correct tightness required by the design. + Factory floor construction: Perform steel reinforcing work and concrete pouring, and it must follow the correct process to avoid floor concrete cracking.

1.2. Steel frame construction:

+ Steel frame erection: Lift and place steel structural parts into designated positions. + Purlin and bracing cable erection: When installing, make sure to ensure stability out of the frame plane. + Enclosure shell construction: Build surrounding walls and construct the metal roof.

1.3. Infrastructure construction:

Install drainage pipes, compact road bases, compact road base stones, cure road base concrete, cut joints to prevent cracking, etc.

1.4. Technical system construction:

Includes fire protection systems, communication systems, electrical systems, technical systems serving production, etc.

1.5. Finishing:

Includes steps like painting traffic lane lines, installing gypsum ceilings for office areas, planting grass to create green spaces outside the factory, planting trees and flowers inside the factory, and Feng Shui miniatures (if any).

1.6. Cleaning and putting into use:

Clean up the factory and collective cafeteria, and install machinery and equipment. To understand more clearly about the details of each step of factory and pre-engineered steel building construction, you can look over the article here.  

2. A good factory needs to meet fully the following standards:

1. Factory location 2. Standards on design 3. Factory structure 4. Factory water supply and drainage system Details about each standard to build a good and quality factory, you can refer here.

3. Some notes when building a factory

3.1. Factory foundation part

– The foundation is the core, most important structure of any construction project, and factories are no exception. – When designing and building this part, the architect needs to pay special attention to expressing technical parameters in the most full and detailed manner. – Materials and details used to make foundations must fully meet the given standards and codes, ensuring full conditions to deploy and construct the project. – When choosing positions to place foundations, different soil grounds will have different handling methods. – If the factory is built on weak soil or mud ground, it is necessary to reinforce the foundation further by using pile pressing solutions, bored piles… – If the factory is built on hard soil ground, foundation construction can proceed normally without needing further foundation reinforcement like pile pressing or driving melaleuca piles. – See more about foundation construction here.

3.2. Factory floor part

– Depending on the usage function, the design unit and factory construction unit have methods to perform in the most reasonable manner. – Besides, the thickness of the floor concrete layer also needs attention. Depending on the production nature and activities of the enterprise, using large or small heavy-duty machinery, the thickness of the floor concrete is changed appropriately, concrete thickness fluctuates from 10, 20, 30 or 50cm. – After the factory concrete part is constructed, to increase durability for them, smooth the floor and paint an epoxy layer on the floor surface to prevent dust accumulation and make it easy to wipe and clean up.

3.3. Factory structure

During the factory building process, you, the architect, and the contractor unit need to exchange frequently to propose how many columns, rafters, beams, and factory purlins are appropriate. Avoid cases of lacking one of the above factors, causing an impact on project quality or causing waste.

3.4. Select a quality design and construction General Contractor unit

Another factor making up factory quality is construction human resources. The skills of building worker teams require professionalism and deep understanding of this field. In this way, the project can guarantee the best quality. DANG PHAT TRADING INVESTMENT CONSTRUCTION CO., LTD Perfect Quality, Best Service, Competitive Cheap Price, Fast Progress Dang Phat Trading Investment Construction Co., Ltd is a unit specialized in construction mechanics and factory repairs in Dong Nai. With long-term experience in the industry, we are confident to bring customers quality and effective solutions. With a team of skilled technicians and workers, we commit to bringing professional factory repair services, ensuring safety and progress. By applying advanced technology and quality materials, each project we carry out achieves perfection in both quality and durability. With the motto “Quality is reputation”, we always put the interests of customers first and commit to bringing the highest satisfaction for every project. Let Dang Phat be a reliable partner in repairing and building factories in Dong Nai.